概要:1.1.4.8 “Statement” means a statement submitted by the Contractor as part of an application for payment under Clause 14 [Contract Price and Payment].1.1.5 Works and Goods1.1.5.1 “Contractor’s Equipment” means all apparatus, machinery, vehicles and other things required for the execution and completion of the Works and remedying of any defects. However, Contractor’s Equipment excludes Temporary Works, Employer’s Equipment (if any), Plant, Materiwww.67jzw.comals and any other things int

FIDIC设计采购施工(EPC)合同条件(银皮书英文版),标签:工程预算学习,建筑工程概预算,http://www.67jzw.com
1.1.4.8 “Statement” means a statement submitted by the Contractor as part of an application for payment under Clause 14 [Contract Price and Payment].
1.1.5  Works and Goods
1.1.5.1 “Contractor’s Equipment” means all apparatus, machinery, vehicles and other things required for the execution and completion of the Works and remedying of any defects. However, Contractor’s Equipment excludes Temporary Works, Employer’s Equipment (if any), Plant, Materi

www.67jzw.comals and any other things intended to form or forming part of the Permanent Works.
1.1.5.2 “Goods” means Contractor’s Equipment, Materials, Plant and Temporary Works, or any of them as appropriate.
1.1.5.3 “Materials” means things of all kinds (other than Plant) intended to form or forming part of the Permanent Works, including the supply-only materials (if any) to be supplied by the Contractor under the Contract.
1.1.5.4 “Permanent Works” means the permanent works to be designed and executed by the Contractor under the Contract.
1.1.5.5 “Plant “means the apparatus, machinery and vehicles intended to form or forming part of the Permanent Works.
1.1.5.6 “Section” means a part of the Works specified in the Particular Conditions as a Section (if any).
1.1.5.7 “Temporary Works” means all temporary works of every kind (other than Contractor’s Equipment) required on Site for the execution and completion of the Permanent Works and the remedying of any defects.
1.1.5.8 “Works” means the Permanent Works and the Temporary Works, or either of them as appropriate.
1.1.6  Other Definitions
1.1.6.1 “Contractor’s Documents” means the calculations, computer programs and other software, drawings, manuals, models and other documents of a technical nature supplied by the Contractor under the Contract; as described in Sub-Clause 5.2 [Contractor’s Documents].
1.1.6.2 “Country” means the country in which the Site (or most of it) is located, where the Permanent Works are to be executed.
1.1.6.3 “Employer’s Equipment” means the apparatus, machinery and vehicles (if any) made available by the Employer for the use of the Contractor in the execution of the Works, as stated in the Employer’s Requirements; but does not include Plant which has not been taken over by the Employer.
1.1.6.4 “Fore Majeure” is defined in Clause 19 [Fore Majeure].
1.1.6.5 “Laws” means all national (or state) legislation, statutes, ordinances and other laws, and regulations and by-laws of any legally constituted public authority.
1.1.6.6 “Performance Security” means the security (or securities, if any) under Sub-Clause 4.2 [Performance Security].
1.1.6.7 “Site” means the places where the Permanent Works are to be executed and to which Plant and Materials are to be delivered, and any other places as may be specified in the Contract as forming part of the Site.
1.1.6.8 “Variation” means any change to the Employer’s Requirements or the Works, which is instructed or approved as a variation under Clause 13 [Variation and Adjustment].
1.2 Interpretation
In the Contract, except where the context requires otherwise:
(a) Words indicating one gender include all genders;
(b) Words indicating the singular also include the plural and words indicating the plural and words indicating the plural also include the singular.
(c) Provisions including the word “agre

www.67jzw.come”, ”agreed” or “agreement” require the agreement to be recorded in writing, and
(d) “written” or “in writing” means hand-written, type-written, printed or electronically made, and resulting in a permanent record.
The marginal words and other headings shall not be taken into consideration in the interpretation of these Conditions.
1.3 Communications
Wherever these Conditions provide for the giving or issuing of approvals, certificates, consents, determinations, notices and requests, these communications shall be:
(a) in writing and delivered by hand(against receipt), sent by mail or courier, or transmitted using any of agreed systems of electronic transmission as stated in the Particular Conditions; and
(b) delivered, sent or transmitted to the address for the recipient’s communications as stated in the Contract. However:
(i) if the recipient gives notice of another address, communications shall thereafter be delivered accordingly; and
(ii) if the recipient has not stated otherwise when requesting an approval or consent, it may be sent to the address from which the request was issued.
Approval, certificates, consents and determinations shall not be unreasonably withheld or delayed.

上一页  [1] [2] [3] [4] [5] [6] [7]  下一页


Tag:造价预算工程预算学习,建筑工程概预算工程资料 - 造价预算

上一篇:创建工程造价管理信息平台 实现全过程造价管理

《FIDIC设计采购施工(EPC)合同条件(银皮书英文版)》相关文章

会员评论


联系本站 | 免责声明 | 下载帮助 | 建筑资料下载 | 房地产资料 | 建筑资料库二 | 建筑课堂 | 建筑考试 | 装修设计 | 网站地图 | 收藏本站

Copyright 牛气建筑网 版权所有 All Right Reserved.

1 2 3 4 5 6 7 8 9 10