FIDIC设计采购施工(EPC)合同条件(银皮书英文版)

[08-22 14:23:58]   来源:http://www.67jzw.com  造价预算   阅读:8411

概要:CONTENTS1 GENERAL PROVISIONS 11.1 DEFINITIONS 11.2 INTERPRETATION 61.3 COMMUNICATIONS 61.4 LAW AND LANGUAGE 71.5 PRIORITY OF DOCUMENTS 71.6 CONTRACT AGREEMENT 81.7 ASSIGNMENT 81.8 CARE AND SUPPLY OF DOCUMENTS 81.9 CONFIDENTIALITY 81.10 EMPLOYER’S USE OF CONTRACTOR’S DOCUMENTS 91.11 CONTRACTOR’S USE OF EMPLOYER’S DOCUMENTS 91.12 CONFIDENTIAL DETAILS 101.13 COMPLIANCE WITH LAWS 101.14 JOINT AND SEVERAL LIABILITY 102 THE EMPLOYER 112.1 RIGHT OF ACCESS TO THE SITE 112.2 PERMITS, LICENCES O

FIDIC设计采购施工(EPC)合同条件(银皮书英文版),标签:工程预算学习,建筑工程概预算,http://www.67jzw.com

CONTENTS
1 GENERAL PROVISIONS 1
1.1 DEFINITIONS 1
1.2 INTERPRETATION 6
1.3 COMMUNICATIONS 6
1.4 LAW AND LANGUAGE 7
1.5 PRIORITY OF DOCUMENTS 7
1.6 CONTRACT AGREEMENT 8
1.7 ASSIGNMENT 8
1.8 CARE AND SUPPLY OF DOCUMENTS 8
1.9 CONFIDENTIALITY 8
1.10 EMPLOYER’S USE OF CONTRACTOR’S DOCUMENTS 9
1.11 CONTRACTOR’S USE OF EMPLOYER’S DOCUMENTS 9
1.12 CONFIDENTIAL DETAILS 10
1.13 COMPLIANCE WITH LAWS 10
1.14 JOINT AND SEVERAL LIABILITY 10
2 THE EMPLOYER 11
2.1 RIGHT OF ACCESS TO THE SITE 11
2.2 PERMITS, LICENCES OR APPROVES 11
2.3 EMPLOYER’S PERSONNEL 12
2.4 EMPLOYER’S FINANCIAL ARRANGEMENTS 12
2.5 EMPLOYER’S CLAIMS 12
3 THE EMPLOYER’S ADMINISTRATION 13
3.1 THE EMPLOYER’S REPRESENTATIVE 13
3.2 THE EMPLOYER’S PERSONNEL 14
3.3 DELEGATED PERSONS 14
3.4 INSTRUCTIONS 15
3.5 DETERMINATIONS 15
4 THE CONTRACTOR 15
4.1 THE CONTRACTOR’S GENERAL OBLIGATIONS 15
4.2 PERFORMANCE SECURITY 16
4.3 CONTRACTOR’S REPRESENTATIVE 17
4.4SUBCONTRACTORS 18
4.5 NOMINATED SUBCONTRACTORS 18
4.6 CO-OPERATION 19
4.7 SETTING OUT 19
4.8 SAFETY PROCEDURES 20
4.9 QUALITY ASSURANCE 20
4.10 SITE DATA 20
4.11 SUFFCIENCY OF THE CONTRACT PRICE 21
4.12 UNFORESEEABLE DIFFICULTIES 21
4.13 RIGHTS OF WAY AND FACILITIES 21
4.14 AVOIDANCE OF INTERFERENCE 21
4.15 ACCESS ROUTE 22
4.16 TRANSPORT OF GOODS 22
4.17 CONTRACTOR’S EQUIPMENT 23
4.18 PROTECTION OF THE ENVIRONMENT 23
4.19 ELECTRICITY, WATER AND GAS 23
4.20 EMPLOYER’S EQUIPMENT AND FREE-ISSUE MATERIAL 24
4.21 PROGRESS REPORTS 24
4.22 SECURITY OF THE SITE 26
4.23 CONTRACTOR’S OPERATIONS ON SITE 26
4.24 FOSSILS 26
5 DESIGN 27
5.1 GENERAL DESIGN OBLIGATIONS 27
5.2 CONTRACTOR’S DOCUMENTS 28
5.3 CONTRACTOR’S UNDERTAKING 29
5.4 TECHNICAL STANDARDS AND REGULATIONS 29
5.5 TRAINING 30
5.6 AS-BUILT DOCUMENTS 30
5.7 OPERATION AND MAINTENANCE MANUALS 31
5.8 DESIGN ERROR 31
6 STAFF AND LABOUR 31
6.1 ENGAGEMENT OF STAFF AND LABOUR 31
6.2 RATES OF WAGES AND CONDITIONS OF LABOUR 31
6.3 PERSONS IN THE SERVICE OF EMPLOYER 32
6.4 LABOUR LAWS 32
6.5 WORKING HOURS 32
6.6 FACILITIES FOR STAFF AND LABOUR 32
6.7 HEALTH AND SAFETY 32
6.8CONTRACTOR’S SUPERINTENDENCE 33
6.9CONTRACTOR’S PERSONNEL 33
6.10 RECORDS OF CONTRACTOR’S PERSONNEL AND EQUIPMENT 34
6.11 DISORDERLY CONDUCT 34
7 PLANT, MATERIALS AND WORKMANSHIP 34
7.1 MANNER OF EXECUTION 34
7.2 SAMPLES 34
7.3 INSPECTION 35
7.4 TESTING 35
7.5 REJECTION 36
7.6 REMEDIAL WORK 37
7.7 OWNERSHI

www.67jzw.comP OF PLANT AND MATERIALS 37
7.8 ROYALTIES 38
8 COMMENCEMENT, DELAYS AND SUSPENSION  38
8.1 COMMENCEMENT OF WORKS 38
8.2 TIME FOR COMPLETION 38
8.3 PROGRAMME 38
8.4 EXTENSION OF TIME FOR COMPLETION 39
8.5 DELAYS CAUSED BY AUTHORITIES 40
8.6 RATE OF PROGRESS 40
8.7 DELAY DAMAGES 41
8.8 SUSPENSION OF WORK 41
8.9 CONSEQUENCES OF SUSPENSION 42
8.10 PAYMENT FOR PLANT AND MATERIALS IN EVENT OF SUSPENSION 42
8.11 PROLONGED SUSPENSION 43
8.12 RESUMPTION OF WORK 43
9 TESTS ON COMPLETION 43
9.1 CONTRACTOR’S OBLIGATIONS 43
9.2 DELAYED TESTS 44
9.3 RETESTING 45
9.4 FAILURE TO PASS TESTS ON COMPLETION 45
10 EMPLOYER’S TAKING OVER 45
10.1 TAKING OVER OF THE WORKS AND SECTIONS 45
10.2 TAKING OVER OF PARTS OF THE WORKS 46
10.3 INTERFERENCE WITH TESTS ON COMPLETION 46
11 DEFECTS LIABILITY 47
11.1 COMPLETION OF OUTSTANDING WORK AND REMEDYING DEFECTS 47
11.2 COST OF REMEDYING DEFECTS 48
11.3 EXTENSION OF DEFECTS NOTIFICATION PERIOD 48
11.4 FAILURE TO REMEDY DEFECTS 48
11.5 REMOVAL OF DEFECTIVE WORK 49
11.6 FURTHER TESTS 49
11.7 RIGHT OF ACCESS 50
11.8 CONTRACTOR TO SEARCH 50
11.9 PERFORMANCE CERTIFICATE 50
11.10 UNFULFILLED OBLIGATIONS 51
11.11 CLEARANCE OF SITE 51
12 TESTS AFTER COMPLETION 51
12.1 PROCEDURE FOR TESTS AFTER COMPLETION 51
12.2 DELAYED TESTS 52
12.3 RETESTING 52
12.4 FAILURE TO PASS TESTS AFTER COMPLETION 53
13 VARIATIONS AND ADJUSTMENTS 54
13.1 RIGHT TO VARY 54
13.2 VALUE ENGINEERING 54
13.3 VARIATION PROCEDURE 54

[1] [2] [3] [4] [5] [6] [7]  下一页


Tag:造价预算工程预算学习,建筑工程概预算工程资料 - 造价预算

上一篇:创建工程造价管理信息平台 实现全过程造价管理

《FIDIC设计采购施工(EPC)合同条件(银皮书英文版)》相关文章

会员评论


联系本站 | 免责声明 | 下载帮助 | 建筑资料下载 | 房地产资料 | 建筑资料库二 | 建筑课堂 | 建筑考试 | 装修设计 | 网站地图 | 收藏本站

Copyright 牛气建筑网 版权所有 All Right Reserved.

1 2 3 4 5 6 7 8 9 10